Lade Braes, St Andrews
Drainage, attenuation and foundations for a residential development on a steep, restricted site in St Andrews.
Groundworks on a constrained site
Alpha Projects appointed SDB Contracts to deliver the groundworks package at Lade Braes. The steeply sloping, landlocked plot required careful coordination of access, plant movements and material deliveries.
Working from the drainage outfall upwards
Works began at the lowest point, constructing a drainage outfall into the existing burn. SDB then worked back up the site, installing drainage infrastructure and attenuation tanks before progressing to the house footprint. Approximately 1,000 tonnes of excavated material was removed from the restricted site.
Precision foundation work
Individual pad foundations incorporated cast-in holding-down bolts for the structural frame. SDB’s site engineer set out each bolt assembly to the structural design before concrete was poured. Stepped foundations and solums accommodated the natural slope.
Next phase
Phase one is complete. A return phase is planned for the remaining house drainage, infill, final preparation and concrete pours to the solums.
A closer look at the work.
Select a photograph to enlarge it. Use Previous and Next to browse the gallery.
On site at Lade Braes.
A site view of reinforcement and an operative reviewing drawings at Lade Braes, St Andrews.
The photographs show the excavation and the surrounding site.