Emergency reconstruction of an approximately 85-metre retaining wall, retaining its original stone appearance over a new concrete structure.
Emergency retaining-wall works
Dundee City Council appointed SDB Contracts after part of the stone retaining wall at Dalkeith Road collapsed. The remaining structure was considered unsafe and required substantial reconstruction along approximately 85 metres.
Rebuilding the structure
The existing wall was demolished in a controlled sequence. Original stone was carefully removed, sorted and retained for reuse. New foundations supported a mass-fill concrete wall approximately 1.6 metres high and 1 metre deep. Temporary formwork allowed the structure to be completed in controlled pours along its length.
Preserving the stone finish
Stonemasons rebuilt the salvaged stone against the face of the concrete wall and tied it into the new structure. This retained the traditional appearance while providing a stronger structural solution. A new fence was installed above the wall, and the adjoining footpath was upgraded and reinstated.
A closer look at the work.
Select a photograph to enlarge it. Use Previous and Next to browse the gallery.



Along the retaining wall.
A short aerial view of the curved wall and the excavated ground alongside it.
The still photographs show additional views of the road, working area and wall construction.
View 3 photographsSilent project footage. Press play to watch; use the player controls for full screen.
Have a similar project in mind?
Tell us where the job is, what you need done and when you would like work to start.