Balgay Cemetery Steps
Approximately 150 timber and concrete steps built across the steep ground at Balgay Cemetery.
Improving access on Balgay Hill
Paths across the steeply sloping cemetery had become difficult to use in places because of their gradient and condition. SDB Contracts assisted with the design of a stepped access solution and carried out its construction.
Building across the gradient
Approximately 150 steps were constructed using a combination of timber and concrete. The steep terrain required careful handling of materials, access planning and consistent setting of levels throughout the installation.
A more practical route
The completed steps provide a safer, more practical route through this part of the cemetery, using timber and concrete.