The SDB Contracts team were awarded the contract to remove the old concrete slab at 71 Brewing and replace it with a new one. The slab was poured using reinforced fibre concrete and works also included new drainage tied back to existing systems and also new concrete ramps. SDB frequently carries out civil engineering work to this ever expanding brewery and looks forward to continuing our partnership in the future.